General Use
Process | Material | Mixing (Ratio) |
Amount (kg/m2) |
No. of coats |
Within Process | Between Process | Final Curing | Method |
---|---|---|---|---|---|---|---|---|
Surface preparation/inspection | Impurities on the surface should be completely removedUse putty flatten grooves, cracks, and damages. | |||||||
Undercoat | Combi Primer
Water |
100
5% or lower |
0.15-0.2 | 1-2 | - | 4 or longer | - | Brush, Roller |
Joints | Drawing Line
joints |
Design the position of joints and draw a line with ink or chalk.
Attach caulking material along joints and remove joint cover after lining. |
||||||
Lining | Combi Stone
Water |
100
5% or lower |
4-5 | 1-2 | - | 4 or longer | 24 or longer | Spray |
Topcoat | Combi AS#300
Water |
100
5% or lower |
0.15-0.2 | 1-2 | - | 4 or longer | 24 or longer | Brush, Roller, Spray |